
February 22 & 23 saw a lot of members at the field to lay the pipe work for irrigation of the East-West runway.
First, a pipe from the dam up to the holding dam, then to the runway with 90mm pipe for the sprinkler system.

Lunch was provided, though most of us put some dollars in to defray the cost
Daryl brought out his caravan and cooked up a storm.
Weather was kind to us, not too hot.
A wonderful effort by all who attended.